Fortescue Ltd
Materials
Current price
Target price 00%
Ranks rating
76
Position in sub-industry
318 / 751
Position in country
1139 / 5413
Net income margin, %
35
2.7
EBITDA margin, %
62.2
7.4
P/BV
5.7
0.9
EV/EBITDA
4.7
7.9
Average Analyst recommendation
Sell
Sell
Average upside forecasts, %
-55.1
16.6
Dividend Yield, %
8
2.6
Forward Dividend Yield, %
3.3
0.4
Expected dividend per share
1.1
0.1
Payout Ratio, %
72.1
22
Dividend Ex Date
2024-03-01
Competitors
Ranks
-
Stanmore Resources Ltd
00%
-
BlueScope Steel Ltd
00%
-
Vale SA
00%
-
Champion Iron Ltd
00%
-
Sims Ltd
00%
-
Nucor Corp
00%
-
Fortescue Ltd
00%
-
Deterra Royalties Ltd
00%
-
Reliance Inc
00%
-
Coronado Global Resources Inc
00%
Ready-made portfolio of the best Russian stocks
- Created by artificial intelligence
- Verified by analysts
- Available even to beginners
Company information
Country
Australia
Sector
Materials
Industry group
Materials
Industry
Metals & Mining
Sub-sector
Materials
Capitalization (millions of $)
51819.5
Ticker
FSUGY.PK
ISIN
US34959A2069
IPO date
1987-03-19
Availability on Russian exchanges
No
Reporting for
2024-02-21
Date fact. publication of reports
2023-12-31
Company Description
Fortescue Metals Group Limited (Fortescue) is an Australia-based company engaged in iron ore mining. The Company is focused on exploration, development, production, processing, and sale of iron ore. Fortescue owns and operates a fully integrated infrastructure and supply chain, including five-berth Herb Elliott Port in Port Hedland; the Judith Street Harbour towage infrastructure and the heavy-haul railway covering 620 kilometers of track. The Company is also developing the Eliwana Mine and Rail Project and the Iron Bridge Magnetite Project. Its Chichester Hub in the Chichester Ranges includes the Cloudbreak and Christmas Creek mines. The Solomon Hub in the Hamersley Ranges is located 60 kilometers north of Tom Price and 120 kilometers to the west of its Chichester Hub. It includes the Firetail and Kings Valley mines, which together have a production capacity of 75 million tons per annum (mtpa). Its Iron Bridge project is located over 145 kilometers south of Port Hedland.
A step towards better analytics
- find the best promotions through the Screener
- keep an eye on stock valuation
- download detailed reports
and much more after free registration
RegistrationMore convenient from your phone? Download: